Keywords

3D Seismic Survey Block 58 finished

10/4/2016

The 3D seismic survey in Block 58 was successfully completed on 29 September 2016. The survey covered an area of approximately 6,100km2 and was conducted by the Polarcus Alima.

News by year

© 2017 Staatsolie Maatschappij Suriname N.V. All rights reserved.